OCEANIC BRIDGE: CLOSURE BEGINS

oceanic 052515Boaters and kayakers shared the Navesink River with a construction barge at the Oceanic Bridge on Monday, Memorial Day. The 75-year-old span, which links Rumson and Middletown, was scheduled to close to all but marine traffic starting at 6 a.m. Tuesday for repairs to the steel bascule.

During repairs in April, deterioration was discovered in two areas of the bascule not previously accessible, Monmouth County officials said last month. The latest repairs are expected to wrap up with a reopening of the bridge on Saturday, June 13. In the meantime, seasonal rules and scheduling will be in effect for marine traffic. (Photo by Peter Lindner. Click to enlarge)