LITTLE SILVER: PEDESTRIANS GET A BRIDGE
Three months into the rebuilding of a bridge on Seven Bridges Road in Little Silver, a sturdy footbridge has been installed. Previously, pedestrians and bikers, including students at Point Road School, were forced to use a cordoned-off shoulder of the bridge under reconstruction.
The $2.7 million replacement of the timber bridge over Little Silver Creek was anticipated to take six months or more when the Monmouth County engineer launched the project in July. (Click to enlarge)